Cuplock Scaffolding 2.5m Standard for Event Stage and Temporary Grandstand
Cuplock Scaffolding 2.5m Standard for Event Stage and Temporary Grandstand
Overview
Cuplock Scaffolding is a premium modular falsework and access system characterized by its unique cup-and-blade locking mechanism. Engineered for stability and efficiency, it excels in high-rise construction, bridge support, and heavy-duty industrial applications where safety and rapid deployment are critical.
Features & Functions
- Instant Blade Locking: Horizontal ledgers are secured by lowering a steel blade into the bottom cup and locking with the top cup, creating a rigid connection in seconds without tools or loose fasteners.
- Uniform Node Spacing: The standardized 500mm vertical node interval provides predictable load distribution and simplifies engineering calculations, ensuring consistent stability across the entire structure.
- Multi-Directional Bracing: Diagonal braces connect seamlessly into the same cup nodes, creating a fully triangulated structure that resists lateral forces and high wind loads for enhanced worksite safety.
- Versatile Configuration: The system's modularity allows for easy assembly of straight runs, return corners, and large-area working platforms, adapting efficiently to complex architectural designs.
Key Specifications
- Primary Material: Q345B High-Strength Steel
- Standard Size: 48.3mm OD, Wall 3.2mm
- Common Lengths: 0.5m, 1.0m, 1.5m, 2.0m, 2.5m, 3.0m
- Safe Working Load: Up to 5 kN per standard (configurations vary)
- Surface Finish: Full Hot-Dip Galvanized Protection
Competitive Advantages
- Engineered Safety Standard: The cup-lock design prevents accidental disengagement, and the uniform nodal spacing meets strict international safety codes for heavy-load applications.
- Optimized Project Timeline: Significantly faster assembly than tube-and-clamp systems reduces overall project duration, lowering indirect costs and enabling earlier project completion.
- Long-Term Asset Value: Constructed from high-grade, galvanized materials, the system maintains structural integrity over hundreds of reuse cycles, offering contractors and rental firms an excellent return on investment.
Product Parameters
Standards (Uprights)
| Item No. |
Length |
Weight |
Picture |
| BSCS 300 |
3m/9'10" |
17.5kg/38.25 Ibs |
 |
| BSCS 250 |
2.5 m/8'2" |
14.57 kg/32.12 Ibs |
|
| BSCS 200 |
2m/6'2" |
11.82 kg/26.07 Ibs |
|
| BSCS 150 |
1.5 m/4'11" |
9.05 kg/19.95 Ibs |
|
| BSCS 100 |
1 m/3'3" |
6.3 kg/13.91 Ibs |
|
| BSCS O50 |
0.5m/1'8" |
3.5 kg /7.77 Ibs |
|
Ledgers (Horizontal Braces)
| Item No. |
Length |
Weight |
Picture |
| BSCL 250 |
2.5 m/8'2" |
9.35 kg/20.61 Ib |
 |
| BSCL 180 |
1.8 m/6' |
6.85 kg / 15.1 Ibs |
|
| BSCL 150 |
1.5 m/4'11" |
5.75 kg/9.46 Ibs |
|
| BSCL 120 |
1.2m/4 |
4.29 kg/13.91 Ibs |
|
| BSCL 090 |
0.9m/3' |
3.55 kg /7.83 Ibs |
|
| BSCL 060 |
0.6m/2' |
2.47 kg / 5.45 Ibs |
|
Our Services
- Customized Production Services: Professional engineering team provides detailed product application solutions based on your project drawings.
- Timely Response Service: Professional engineers available before, during, and after sales to promptly solve and meet your needs.
- Worry-Free After-Sales Service: One-on-one service teams to help complete implementation and landing of engineering projects.
Frequently Asked Questions
Are you a trading company or a manufacturer?
We are a subsidiary foreign trade company of a group company, responsible for operating export business of formwork and scaffolding products. Our group has two major production bases with over 20 years of production experience.
How can I get a quotation?
For simple projects with your own engineer, provide a bill of materials. For complex projects like apartments and residences, our consultants will develop an application plan based on your engineering drawings.
How long does it usually take to complete the plan and quotation?
Generally 5-8 days to complete specific plans and detailed quotations.
Can you provide free samples?
Yes, we can provide samples. You will need to pay for the shipping cost.
How long is the estimated delivery time after the contract is signed?
Usually 30-60 days depending on project complexity. More accurate delivery times are provided during planning.
Is the plastic template prone to deformation?
In long-term high temperature environments, slight deformation may occur. We recommend aluminum alloy formwork or steel frame wood formwork for high temperature areas.
What are the defects of the plastic template system?
Limited load capacity for large-sized concrete structures and poor high temperature resistance with potential deformation in high-temperature areas.
What is the payment method you require?
Payments ≤1,000USD: 100% in advance. Payments ≥10,000USD: 30% T/T in advance, balance before shipment. L/C also accepted.